How to avoid mistakes when placing a house on a plot.
Where to place a house on a plot.
The article analyzes three examples of house placement on the site.
Example # 1. How to do it is not necessary.
At their own site, 10 hundred owners decided to build such a small house in the size of 8 x 4m. In order to leave as much space as possible for the city, the house decided to slide it to the maximum in the corner of the plot. The saying is done.

A brigade of builders worked on the area of the neighbors. The owners decided to take advantage of the coincidence of the circumstances, agreed with the workers and they "quickly" poured the foundation. And then, also "on the fast" built a house.

It seemed that everything was fine. After all, the site own, what I want, and I do.
However, it turned out that in order to get ownership you need to arrange documents for the house. And there were problems with this.
At the high-speed pouring of the foundation, the owner made a number of mistakes.
1. The house was placed too close to the transmission line. In this case, the distance from the wires to the house should be not less than 10 m.
2. The house was set very close to the border of the plot. From home to border is only 0.5m. Minimum distance according to DBN should be at least 1 m, and if from the street there are "red lines of building constraint", then not closer to the "red line".
It is not possible to correct such mistakes without destroying the house.
They appeared because before the start of construction was made a mistake number 3 - was not received "Building passport." When preparing the "Building Passport", in accordance with the requirements of the law, the owner would receive a note, moved the house to the right place. All this on paper, and without problems began construction.
By the way, this procedure takes only 20 days (10 days of receipt of the "building passport" + 10 days registration in the architectural and construction inspection).
Example number 2. How to do it in a tight area?
The plot was small, 18 x 28 m, and very congested. To the right and to the left, almost close to the fence, the neighbors' houses already stood. The distance from the neighboring houses to the boundaries of the plot is 1.8 and 4.8 m.

According to today's fire standards, the distance between houses should be not less than 8m. In order to determine the place for the future house, a topography of the plot was performed.

Thanks to the toposion it was possible to determine the exact boundaries of the spot on which you can place the house without breaking the rules. It turned out that in this section the width of the house should not be more than 9.1 m.
The project "Seagull" was selected, it is a two-storey house with four bedrooms with a total area of 111m2.

The width of the house 9.06 m allowed to place it on the site, without any problems get a "Building passport" and begin construction.
Example number 3. Hidden troubles.
In addition to the troubles that can be seen with the naked eye: a narrow plot, electricity lines or neighbors' homes can be troublesome that the owner suspects since they are underground.
This plot has dimensions 44 x 20 m, almost 9 hectare. At the site it is planned to build a small house of 7 x 8 m on the project "Agatha".

It would seem that the house would be in the middle and there would be no problems. However, under the ground at a depth of 2 m there is a water main pipe. And the water main has a protective zone on which to build it is impossible. Therefore, if we put the house in the middle of the plot, our foundation will fall into the protective zone and the house will be forced to demolish. Through trial

In the beginning of the construction of Prerest the topography of the site was performed, which showed both the main water supply and the protective zone. Therefore the house was shifted. To the left of the house to the boundary of the site left 4 m, and to the right - 9 m. In this case, the foundation did not hit the protective zone.
By the way, in the protective zone of the water supply system, you can plant trees, plant grass or arrange a city.

As can be seen from the examples given, it is possible to build without violations. To do this, you just have to have a house design and get the necessary permits.
Contact us and we will help you to avoid troubles and unnecessary financial expenses.
You can choose a house project - >> HERE
Read more about site planning here
Read about the mistakes when planning the site here
Why is it beneficial for you to contact us?