Overlapping the house with your own hands

Construction of a frame house - overlap

For covering selected beams section 100х200mm (for a passage of 4,2 m). Expand the beams with a step of 580mm for easy installation of the heater.

frame house to build. Beams

It was the first frame house built by our own hands. After reinsurance, all of our beams were treated with oil to protect against rotting. Also, the finish was subjected to the lower bound. Later we were convinced that this could not be done, waterproofing reliably protects the building from moisture penetration.

How to build a frame house with your own hands. Beam processing

wooden house

fastening of ceilings;

Beams are securely tied to the foundation

How to build a frame house with your own hands. Fastening beams

For fastening beams used knitting wire 4 mm in 2 layers;

build a frame house panel. Binding of beams by wire

To the outer walls of the beam are fastened with the help of mortgages reinforcement, locked in the wall

(also superfluous work, threaded pins in the foundation enough)

construction of frame houses is inexpensive. Fastening beams to the walls

Beams, which rest on the central wall, are interconnected under the rabbit.

technology of frame housebuilding. How to fix the beams in the middle

Clamping of the intermediate beam on the smoke and ventilation pipe

construction of inexpensive frame houses. Clamping of intermediate beam

house building

Filling of beams overlap

The turn of the beading has come down from below. We process the boards for hot dipping.

wooden frame houses. Sheet processing

Before the sheeting on the beams from the bottom is filled with a windproof film with a cross section at the joints.

construction of frame houses and cottages. Windproof padding

View of the technical pads

building frame houses. The padding is ready

We turn to the installation of the floor of the first floor. Beams stack in the same way, step 590mm. At the ends of the beams, put spacers.

frame building of houses. Overlap of the 1st floor

Selfmade support elements for mounting the intermediate beams in the ceiling 1st floor

Frame construction technology. Intermediate support

Between the pipe and the beams concrete concreting is planned, to increase the rigidity of the pipe. For this around the pipe, in the level of overlap, the corners are fixed to the beam with the beams.

Build a carcass house. Concrete mortgage

To save the ceiling height between the beams of the ceiling is made using plastic rails. To maintain the weight of the heater they are enough

frame house how to build. Ceiling

Construction of a frame house

General view on the overlappings with a backing.

how to build a frame house board Fitting the ceiling of the first floor

View on the back of the second floor. Everything is ready to bookmark the heater.

Build a frame house. It is possible to lay a heater

Read more about building a frame house with your own hands HERE

The next stage - installation of the roof - here

Pavlo Biriukovych
Pavlo Biriukovych
CERTIFIED PASSIVE HOUSE DESIGNER, ENGINEER

Why is it beneficial for you to contact us?

Sell ready cottage projects own production
We carry out individual design
We carry out the design of the reconstruction of houses
We design houses on existing foundations
We carry out design projects of interiors
We correct import projects with regard to domestic materials
We advise on construction and repair