Building a frame house

Frame houses

Frame house construction is 215 m2.

The total area of the building is 215 m2. The dimensions of the building are 17 x 11 m. The building is two-story, the second floor - attic. Foundations are made of monolithic reinforced concrete. Walls are wooden frame with mineral wool insulation. Floors of the first floor on the ground; Wooden overlays.

General view of the house.

Канадський будинок

On the ground floor are: garage, boiler room, bathroom 9m2, hallway 13 m2, kitchen area of 15 m2, living room 27 m2, bedroom or office room 14.5 m2.

Ground floor plan.

планування будинку

On the second floor there are three bedrooms, a billiard room, a dressing room and two bathrooms.

Plan of the second floor.

план будинку

The task is to build a house until spring

The project was completed in September. While the estimates compiled, the equipment had expired for some time.

Beginning of construction work. October.

Underground part of the foundation is ready. From the spot of the house, the soil-vegetative layer is taken away for further use. Installation of formwork for the cap is carried out.

як побудувати будинок

Monolithic concrete plinth is ready. The space under the floor is covered with coarse-grained river sand, sliced with water and is gradually trimmed. The base is ready for laying the heater and floor laying on the soil.

будівля будинку

General view of the foundation in the process of placing horizontal waterproofing. The top of the socle is covered with bituminous-polymeric waterproofing "sporlimod".

як побудувати будинок

During the concreting in the base, threaded studs with a diameter of 12 mm are installed. There is installation of a lower binding of two boards in the thickness of 50 mm.

Дерев'яні будинки

It remains to know:

How to build a house

General view of the foundation in the process of installing the lower strap on the top of the cap.

Як побудувати будинок

Installation of a wooden frame of the first floor began. The frame is made of wooden boards 50 x 150 mm. Boards dry, humidity 22% and treated with antiseptic. To give the stability of the rack unfastened by temporary diagonals.

каркасне будівництво

Filling concrete floor base. Concrete is a layer of foam plastic 150 mm. Concrete screed reinforces a grid of 100 x 100 mm. In the place of the collision of concrete and wooden elements laid waterproofing of polyethylene film.

як побудувати будинок

November.

The first snow fell, but the frame mounting does not stop.

The ground floor frame is ready.

However, an unforeseen delay in the delivery of dry forest occurred during the construction process. In order not to lose time, the OSB board and windproof film began to lining the frame.

Побудувати будинок

General view of the house during the installation of the frame.

Каркасний будинок

In parallel with the installation of racks of the carcass of the second floor, installation of rafters is carried out.

Дерев'яний будинок

framework of the frame.

A general view of the location of the racks in the corner of the building. All elements of the frame are joined by steel galvanized plates and angles. Zinc screws for wood are used for mounting plates.

Будинки за канадською технологією

Node of a frame. Adjoining the rafters to the upper lining of the carcass of the second floor. To the upper binding of the rafters are attached with powerful angles and screws.

Будівництво дерев'яних будинків

Mounting the grid on the rafters. On top of the cobbles will be laid OSB boards..

будівництво каркасних будинків

December.

The frame is ready, and there are rafters. Stacking OSB boards on the roof is underway. We try to put the OSB as quickly as possible to protect it from precipitation.

будівництво котеджів київ

For ventilation pipes of galvanized steel with a diameter of 130 mm were used. The pipes were placed in a brick box. The comet tube 150 mm is located in the middle and is further insulated with mineral wool.

як будувати будинок

Node of installation of beams of overlap.

Швидкомонтовані будинки

The inner surface of the walls is covered with a vapor barrier of reinforced polyethylene film. In the places of installation of radiators a skeleton of boards is provided.

будівництво будинків під ключ

Internal work was carried out in January-February (unfortunately, the photos were not preserved)

May

Exterior wall decoration vinyl siding under brick. The wall siding has been started with siding.

будинок під ключ

The process of lining the walls continues. The roof is covered with a layer of bituminous polymer Euroruberoid without splashes. Lining under the shingles of bitumen.

будівництво будинків київ

The roof is covered with bituminous tiles. Pipe over the roof frame. On a wooden frame will be screwed OSB board, inside a steel pipe, between the pipe and frame mineral wool insulation.

будівництво котеджів

It looks like a house with a siding-lined pipe.

будинок будувати

A fragment of a house with an erker.

побудувати будинок недорого

General view of the house.

frame house ukraine

Now you know about building a turnkey house in the winter

You can view the description of this building in the link below - Ruslan's frame house project 215 m2

About building a frame house with your own hands can be read HERE

Prices for quality frame and prefabricated houses start at $ 200 per m2 (for houses from 120 to 200 m2).

Read more about building frame houses here

Frame house is cheaper than an apartment

Pavlo Biriukovych
Pavlo Biriukovych
CERTIFIED PASSIVE HOUSE DESIGNER, ENGINEER

Why is it beneficial for you to contact us?

Sell ready cottage projects own production
We carry out individual design
We carry out the design of the reconstruction of houses
We design houses on existing foundations
We carry out design projects of interiors
We correct import projects with regard to domestic materials
We advise on construction and repair