Reconstruction in a cozy house from an unfinished country house is simple.

At the end of the summer, a family couple came to our consultation for consultation. Recently they bought a country house with an unfinished "box" building.

We had to help the owners determine if this structure could be put in order or better to demolish and build a new home.

Immediately specify, the money for construction was very limited.

To complete the picture, we decided to go to the site and conduct a visual inspection.

As a result, we received the following data:

The two-story box of an old house 7 * 7 meters
Under the house is a large basement

Cottage from the unfinished "box"

two-story house box

What can be noted positive:

  • Soil foundation - sand.
  • The bottom of the foundations, thanks to the basement, below the freezing point.
  • Floor of the first and second floor - reinforced concrete panels.
  • The walls of the first floor of the brick are 380 mm, the second - 250 mm. According to the strength of this is enough.
  • Cracks in the box and foundation (from the side of the cellar) were not found, that is, if you arrange drainage from the roof and make a scoop to remove water from the foundations, you can hope that the foundations will be good to show themselves further. In Article What can not be saved on construction You will learn about the dangers of saving on the foundations.
  • The roofs are great forests, it protects the walls from wetting.

What is negative:

  • The facade "decorates" the balconies of a rusty steel sheet and channels mounted in the ceiling.
  • To the balcony welded old metal stairs to the attic. The joy of these "bonuses" is not much, only collecting snow and water.
  • Unexpected and dangerous "architectural solutions" were circular-hollow panels that "belive" in the air. They are not designed for such tricks and can be broken at any time.
  • This same panel lay on an attached vestibule with a wall thickness of 250 mm, which began to separate from the weight of the panels from the main structure.
  • The roof must definitely be changed.

Hanging floor panels

 

tambour covered with concrete panels

Based on the wishes of our clients and their limited resources, we have developed a reconstruction project and a detailed action plan.

We decided to do the following works on the reconstruction of the house:

  1. Rusty "bonuses" cut off, life-threatening panels and collapsing towbar; clean up
  2. To the house add an adjoining two floors. In the annex to place: a vestibule, connected with a boiler room for a gas boiler, and an anteroom with a ladder to the second floor. In the future, from there, the entrance to the basement is planned.
  3. In the main house there is a bedroom, a kitchen-studio and a large bathroom.
  4. To the house to attach a car canopy.
  5. At the top you plan a bedroom (14,7 and 18 m2), a small bathroom and a toilet.

existing house plan

attic plan

Here's how our efforts may look like:

how it is and how it will be after the reconstruction of the house view of the future home old unfinished house box

 fully finished cottage after reconstruction

How to implement such plans?

 

The reconstruction is scheduled to be carried out in stages:

Stage # 1. We connect electricity, do water supply and perform dismantling and construction (fitting) work.

Stage # 2. We carry out internal processing and communication. At this stage, you can live fully in the house.

Stage # 3. May be executed later. This is the insulation of the facades and decorative plaster.

To save money, we make an extension from a wooden frame with insulation with mineral wool.

A little later, clients asked for advice on accelerating the move to the house, since at that moment they were renting housing.

After the discussion it was decided:

First complete the first floor and stop there;
Later, after picking up some tools, finish the second floor.

How much can such a reconstruction of a house cost in Ukraine?

Let's answer:

Estimates were calculated taking into account the bringing into residential form only the first floor. Processing the second floor until we count.

Results:

The cost of this "cottage" - about 50-60 thousand dollars, taking into account engineering.

Excerpts from the estimate:

Stage 1

Sewerage with filtration fields - $ 4,200 ($ 1400 - work, $ 2800 - materials)
Water supply + well (35m) - $ 6,300 ($ 500 - work, $ 5800 - materials)
Dismantling - $ 2 050 ($ 1900 - work, $ 150 - consumables)
The foundation and the plinth + ceiling - $ 3 652 ($ 1522 - work, $ 2130 - materials)
The frame of the annex + insulation - $ 4 970 ($ 2470 - work, $ 2500 - materials)
Replacing the roof and manufacturing a canopy above the porch (covering the slate) - $ 4,938 ($ 1650 - work, $ 3288 - materials)
Internal construction work - $ 6,686 ($ 3186 - work, $ 3500 - materials)
Electricity - $ 700 ($ 300 - work, $ 400 - materials)
Preparation for the installation of the heating system - $ 365 ($ 165 - work, $ 200 - materials)
Together, the first stage is $ 33,861

Stage 2

First floor processing - $ 7,700 ($ 3700 - work, $ 4000 - materials)
Distribution of sockets and switches on the ground floor - $ 776 ($ 376 - work, $ 400 - materials)
Santechroboti - $ 4,000 ($ 1500 - work, $ 2500 - materials)
Together, the second stage is $ 12,476

Stage 3

Warming and plastering of facades - $ 6,000 (work and materials equally)

The total cost of converting Cinderella to the Princess is $ 52,337.

 

Solved issues during reconstruction of a country house:

  1. Implemented opportunity to increase the area in view of the growth of the family (in the apartment, this option does not pass).
  2. Parking issues are resolved.
  3. Permanent access to clean air, a place for children's walks, and so on
  4. The result: we get housing cheaper than "Khrushchev" and more in area (in 2007, the most inexpensive "Khrushchev" cost in the city about 60 thousand)

Here's how you can make a comfortable cottage for a young family from an old grandfather's house.

Call us now and we will gladly help you complete the reconstruction project, calculate the "standard" mark and help us to find the skilled experts to turn the dream into reality:

July 2008

See the project of the extension of the winter garden

See all house reconstruction projects

Why is it beneficial for you to contact us?

Sell ready cottage projects own production
We carry out individual design
We carry out the design of the reconstruction of houses
We design houses on existing foundations
We carry out design projects of interiors
We correct import projects with regard to domestic materials
We advise on construction and repair