Water warm floor installation of 60m2 in one day

Installation of water warm floor in one day

In order to make fast laying of water floor you need to decide what slows us down. Consider this process on the example of a warm floor area of 60 m2.

1. Planning layout and marking the warm floor branches.

2. Material for tie

material for a warm floor screed

For the traditional water-warm floor under the screw we need to bring the object, 60 * 70mm (taking into account the height of the pipe) = 4.2 m3 of sand and cement (or ready-mix). It is 6.72 tons.

Gazelle does not accept such a carriage. So you need to order two truck walkings + time for unloading and batching

1. Laying a tube of warm floor and its fastening

układanie konturu ciepłej podłogi

Taking into account the substrate, fittings and anchorage it is a minimum of 4 hours one circuit.

Cumulative on the floor with a tie of 60 m2 in a week and a half weeks.

What about the money?

installation of water warm floor price
Laying the heater, warm floor contours, mounting the comb, filling the screed + delivery and unloading costs from 48 to 60 thousand UAH.

Can it be accelerated and cheaper?

So!

We introduce you the system of water-warm flooring of desktop mounting:

The system consists of finished polystyrene modules (the insulation already exists) in which the profiled groove for laying the warm floor of the required configuration. For efficient removal of heat from the pipe to the surface of the floor, we use omega-shaped plates.

composition of warm floors of water without a tie

1- floor covering

2 - adhesive for a tile with a grid or lining under a laminate

3 - a heat-pipe of a heat-distributor

4 - modular system of warm floor

5 - clean and equal footing

6 - overlap

How does it work?

  1. We measure all rooms and make a circuit layout system.
  2. We make mounting discs with typical or individual modules
  3. Deliver a ready-made system for assembly at the facility

light warm floor

buy accessories for water warm floor

We delivered a warm water floor with a light beige and placed it on the 9th floor manually per hour.

2. Hang the boiler and comb

boiler for warm floor

3. Distribute the system modules indoors in accordance with the layout scheme

warm floor water calculation

4. Expand the modules by the floor according to the scheme

modules under the warm floor

dry warm floor

5. Fix the modules to the floor by accidental shear

stacking warm floor water laying floor heating with water

6. Put the heat distributor

Plates for warm floor   installation of heat distributor

7. We put a pipe of warm floor

Installation of water-warm floor fastening of pipes of warm floor

8. Laying a warm floor in one room takes 90 minutes.

installation of warm water floor

9. Installation of a warm floor in an apartment of 60 m2 takes one day with connection to heating!
 water underfloor heating

  ВІДОЗВІТ ПРО МОНТАЖ -> ТУТ

Advantages of the water warm floor of the light system:

Heat output of 60-80 W / m2 is not inferior to the analogue with a clamp.
No thermal energy, it allows you to effectively use weekly heating programmers and save up to 30% energy.
Such a system is ideally suited for laying both under a laminate and under a tile or linoleum.
When using with an electric heater, the calculated electric power does not occur on the grid of the electric grid as it happens with electric warm floors.
Weight 5 kg / m2 allows you to put it on wooden floors
Modularity makes it possible, if necessary, to disassemble the warm floor and move it to a new place.
You can start the heating system immediately after stacking.
Interested in a light installation system?

The main question remains:

Water heat floor price Kiev
We want to please you!

The cost of a modular installation of a warm floor is only 680 UAH / m2.

 

Pavlo Biriukovych
Pavlo Biriukovych
CERTIFIED PASSIVE HOUSE DESIGNER, ENGINEER

Why is it beneficial for you to contact us?

Sell ready cottage projects own production
We carry out individual design
We carry out the design of the reconstruction of houses
We design houses on existing foundations
We carry out design projects of interiors
We correct import projects with regard to domestic materials
We advise on construction and repair